§ 1521. Central Arizona Project
987 words·~4 min read·
/usc/title-43/section-1521A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)Construction and operation; Hayden-Rhodes Aqueduct and pumping plants; Orme Dam and Reservoir; Buttes Dam and Reservoir; Hooker Dam and Reservoir; Charleston Dam and Reservoir; Tucson aqueducts and pumping plants; Fannin-McFarland Aqueduct; related and appurtenant works For the purposes of furnishing irrigation water and municipal water supplies to the water-deficient areas of Arizona and western New Mexico through direct diversion or exchange of water, control of floods, conservation and development of fish and wildlife resources, enhancement of recreation opportunities, and for other purposes, the Secretary shall construct, operate, and maintain the Central Arizona Project, consisting of the following principal works:
(1)a system of main conduits and canals, including a main canal and pumping plants (Hayden-Rhodes Aqueduct and pumping plants), for diverting and carrying water from Lake Havasu to Orme Dam or suitable alternative, which system may have a capacity of 3,000 cubic feet per second or whatever lesser capacity is found to be feasible: Provided, That any capacity in the Hayden-Rhodes Aqueduct in excess of 2,500 cubic feet per second shall be utilized for the conveyance of Colorado River water only when Lake Powell is full or releases of water are made from Lake Powell to prevent the reservoir from exceeding elevation 3,700 feet above mean sea level or when releases are made pursuant to the proviso in section 1552(a)(3) of this title: Provided further, That the costs of providing any capacity in excess of 2,500 cubic feet per second shall be repaid by those funds available to Arizona pursuant to the provision of section 1543(f) of this title, or by funds from sources other than the development fund;
(2)Orme Dam and Reservoir and power pumping plant or suitable alternative;
(3)Buttes Dam and Reservoir, which shall be so operated as not to prejudice the rights of any user in and to the waters of the Gila River as those rights are set forth in the decree entered by the United States District Court for the District of Arizona on June 29, 1935, in United States against Gila Valley Irrigation District and others (Globe Equity Numbered 59);
(4)Hooker Dam and Reservoir or suitable alternative, which shall be constructed in such a manner as to give effect to the provisions of subsection
(f)of section 1524 of this title;
(5)Charleston Dam and Reservoir;
(6)Tucson aqueducts and pumping plants;
(7)Fannin-McFarland Aqueduct;
(8)related canals, regulating facilities, hydroelectric powerplants, and electric transmission facilities required for the operation of said principal works;
(9)related water distribution and drainage works; and
(10)appurtenant works.
(b)Limitation on water diversions in years of insufficient main stream Colorado River water Article II(B)(3) of the decree of the Supreme Court of the United States in Arizona against California (376 U.S. 340) shall be so administered that in any year in which, as determined by the Secretary, there is insufficient main stream Colorado River water available for release to satisfy annual consumptive use of seven million five hundred thousand acre-feet in Arizona, California, and Nevada, diversions from the main stream for the Central Arizona Project shall be so limited as to assure the availability of water in quantities sufficient to provide for the aggregate annual consumptive use by holders of present perfected rights, by other users in the State of California served under existing contracts with the United States by diversion works heretofore constructed, and by other existing Federal reservations in that State, of four million four hundred thousand acre-feet of mainstream water, and by users of the same character in Arizona and Nevada. Water users in the State of Nevada shall not be required to bear shortages in any proportion greater than would have been imposed in the absence of this subsection. This subsection shall not affect the relative priorities, among themselves, of water users in Arizona, Nevada, and California which are senior to diversions for the Central Arizona Project, or amend any provisions of said decree.
(c)Augmentation of water supply of Colorado River system The limitation stated in subsection
(b)of this section shall not apply so long as the Secretary shall determine and proclaim that means are available and in operation which augment the water supply of the Colorado River system in such quantity as to make sufficient mainstream water available for release to satisfy annual consumptive use of seven million five hundred thousand acre-feet in Arizona, California, and Nevada.
(Pub. L. 90–537, title III, § 301, Sept. 30, 1968, 82 Stat. 887; Pub. L. 100–345, § 2(b), June 24, 1988, 102 Stat. 643; Pub. L. 102–575, title XIII, § 1302, Oct. 30, 1992, 106 Stat. 4662.)
Connections56 cite this · traces to 4
Cited by 56 sections · top 46
U.S. Code
public-private-law
statutes-at-large
- Public Law 98–381To authorize the Secretary of the Interior to construct, operate, and maintain certain facilities at Hoover Dam, and for other purposes
- Public Law 91–439
- Public Law 92–134
- Public Law 93–393
- Public Law 92–405
- Public Law 100–345To designate the Cleveland Ohio General Mail Facility and Main Office in Cleveland, Ohio, as the “John O
- Public Law 99–88Making supplemental appropriations for the fiscal year ending September 30, 1985, and for other purposes
- Public Law 99–503To provide for the replacement of certain lands within the Gila Bend Indian Reservation, and for other purposes
- Public Law 96–69Making appropriations for energy and water development for the fiscal year ending September 30, 1980, and for other purposes
- Public Law 108–451To provide for adjustments to the Central Arizona Project in Arizona, to authorize the Gila River Indian Community water rights settlement, to reauthorize and amend the Southern Arizona Water Rights Settlement Act of 1982, and for other purposes
- Public Law 111–291This Act may be cited as “The Claims Resettlement Act of 2010.”
- Public Law 117–349To approve the settlement of water rights claims of the Hualapai Tribe and certain allottees in the State of Arizona, to authorize construction of a water project relating to those water rights claims, and for other purposes
- Public Law 97–293To authorize the Secretary of the Interior to construct, operate, and maintain modifications of the existing Buffalo Bill Dam and Reservoir, Shoshone project, Pick-Sloan Missouri Basin program, Wyoming, and for other purposes
- Public Law 102–575To authorize additional appropriations for the construction of the Buffalo Bill Dam and Reservoir, Shoshone Project, Pick-Sloan Missouri Basin Program, Wyoming
- Public Law 100–512To provide for the settlement of the water rights claims of the Salt River Pima-Maricopa Indian Community in Maricopa County, Arizona, and for other purposes
- Public Law 101–628To provide for the designation of certain public lands as wilderness in the State of Arizona
- Public Law 95–96Making appropriations for public works for water and power development and energy research tor the fiscal year ending September 30, 1978, and for other purposes
- Public Law 94–180Making appropriations for public works for water and power development and energy research. including the Corps of Engineers—Civil, the Bureau of Reclamation, power agencies of the Department of the Interior, the Appalachian regional development programs, the Federal Power Commission, the Tennessee
- Public Law 94–355Making appropriations for public works for water and power development and energy research, including the Corps of Engineers—Civil, the Bureau of Reclamation, power agencies of the Department of the Interior, the Appalachian regional development programs, the Federal Power Commission, the Tennessee
register
statute-compilations
bill
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 503Definitions
- Sec. 503Definitions
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 3Definitions
- Sec. 1Amendment to Colorado River Basin Project Act
- Sec. 3Definitions
9 references not yet in our index
- Pub. L. 90–537, title III, § 301
- 82 Stat. 887
- Pub. L. 100–345, § 2(b)
- 102 Stat. 643
- Pub. L. 102–575, title XIII, § 1302
- 106 Stat. 4662
- Pub. L. 102–575
- Pub. L. 100–345
- Pub. L. 100–345, § 2
Citation graph
cites case law
§ 1521
Central Arizona Project
Stat.×28
Bills×19
U.S.C.×4
Stat. Comp.×2
Fed. Reg.×1
C.F.R.×1
Pub. L.×1
Pub. L.Pub. L. 90–537, title III, § 301
Stat.82 Stat. 887
Pub. L.Pub. L. 100–345, § 2(b)
Stat.102 Stat. 643
Pub. L.Pub. L. 102–575, title XIII, § 1302
Cites 13 · showing 9Cited by 56 across 7 sources