§ 11.11. Development of environmental analyses and documents.
1,394 words·~6 min read·
/us/cfr/t29/s§ 11.11·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)Potential environmental effects of agency actions shall begin to be examined at the time a topic for potential action is submitted to the agency staff for research, proposal development, or other consideration. During this stage the agency shall determine whether the type of action which may be proposed may be categorically excluded from NEPA environmental analysis requirements pursuant to § 11.10. If the type of action being considered is not categorically excluded, or is an extraordinary case of a normally excluded action which may have significant environmental impacts, development of the information needed to make an environmental assessment shall begin. Actions described in § 11.10(b) shall be submitted to the Assistant Secretary for Administration and Management at this point, pursuant to applicable Departmental procedures, for appropriate review, including a determination with respect to whether or not the action is located in or near a floodplain or wetlands area in connection with the requirements of Executive Orders 11988 and 11990.
(b)When information gathered during the early stages of proposal development indicates that preparation of an environmental impact statement will be required, the agency shall begin preparation of such a document by initiating the scoping process in accordance with 40 CFR 1501.7. However, if the information is not clearly indicative of the need for preparation of an environmental impact statement, an environmental assessment shall be prepared.
(c)Agencies are encouraged, in developing environmental assessments, to explore all factors which it may become necessary to examine should it be determined that preparation of an environmental impact statement is necessary, even though some of those factors, such as economic and social effects, "are not intended by themselves to require preparation of an environmental impact statement" (40 CFR 1508.14). Thus in making environmental assessments of real property actions described in § 11.10(b), agencies are encouraged to consider the following factors, among others:
(1)The nature and degree of any former use of a proposed facility and the number of individuals the facility formerly served, as compared with its use and population to be served under the new proposal;
(2)The population of the area (numbers, density and makeup);
(3)Community facilities and services, taking into consideration capacity and present and former use, including: Health services (hospitals, physicians), business and community development policy, recreational facilities (parks, theaters), fire and police protection, schools, energy resources, waste disposal, water, traffic and roadway systems, sewage systems, communications, and public transportation;
(4)The proximity of the facility to residential areas;
(5)The potential impact on the quality of drinking water, air quality, noise levels, designated scenic areas, land use, soil quality (including drainage or erosion problems), buildings valued for their design or which are otherwise locally significant, the listing or eligibility for listing of a site in the National Register for Historic places, consistent with the requirements of 20 CFR 684.24a where applicable, neighborhood character, and health and safety of residents;
(6)The potential impact on natural systems and resources including rivers and streams, forests, wetlands, floodplains, wilderness areas or places, and species designated for preservation, including species of plants and animals and their critical habitats as identified in regulations published by the Secretary of the Interior (50 CFR chapter I, part 17), and by the Secretary of Commerce (50 CFR chapter II, parts 217, 222.23, 223, and 227.4); and
(7)Other considerations appropriate in light of the nature and size of the project.
(d)If an agency determines, on the basis of an environmental assessment, that preparation of an environmental impact statement is not required, notice of a finding of no significant impact and the availability of the environmental assessment shall be prepared and published in the Federal Register. In the case of proposed rulemaking, the notice of a finding of no significant impact may be published in the Federal Register at any time prior to the publication of the proposed action, or it may be included in the Federal Register notice of proposed rulemaking. Issuance of a finding of no significant impact at the proposal stage of rulemaking shall not foreclose further consideration of environmental issues during the rulemaking proceedings. Therefore the Department of Labor notes that, consistent with 40 CFR 1500.3, the finding shall not be considered final until promulgation of the rule involved (the action affecting the environment).
(1)If it is determined that preparation of an environmental impact statement is not required for an action, but that action is one which would normally require the preparation of an environmental impact statement, an action closely similar to one which would normally require the preparation of an environmental impact statement, or an action without precedent in this regard, the agency shall make a preliminary finding of no significant impact available for public review and comment. In accordance with 40 CFR 1501.4(e)(2), this finding shall be made available for at least 30 days before a final determination is made as to whether an environmental impact statement will be prepared, and before any public record may be closed and the proposed action may become effective.
(2)Although not required by 40 CFR 1501.4(e)(2), an agency may use the procedure described in § 11.11(d)(1) whenever the agency determines it to be appropriate.
(e)If it is determined on the basis of an environmental assessment, prepared in connection with an action described in § 11.10(b), that preparation of an environmental impact statement is required, or that public review is required in connection with actions in floodplains or wetlands that do not require environmental impact statements under E.O. 11988 or E.O. 11990, the agency shall consider altering the proposed action or changing the site of the proposed project, and shall proceed with preparation of an environmental impact statement or appropriate public review actions only after obtaining written authorization from the Assistant Secretary for Administration and Management.
(f)Filing of any draft environmental impact statement with the Environmental Protection Agency (EPA), pursuant to 40 CFR 1506.9, and circulation to the public, will ordinarily coincide with publication of the proposed agency action, which is the subject of that document, in the Federal Register. In any event, the statement will be made available for public comment for at least a 45-day period.
(g)The final decision on the proposed action shall be made not earlier than 90 days following publication of EPA's notice of the filing of the draft environmental impact statement, and, except as provided below, not earlier than 30 days following publication of EPA's notice of the filing of the final environmental impact statement.
(1)In accordance with 40 CFR 1506.10, an agency engaged in rulemaking under the Administrative Procedure Act or other statute, for the purpose of protecting the public health or safety, may waive the 30-day time period noted above and publish a decision on a final rule simultaneously with publication of the notice of the availability of the final environmental impact statement. Therefore, Departmental agencies (such as OSHA and MSHA) meeting these requirements, may file and circulate the final environmental impact statement at the same time a notice of decision is being published, provided that the final rule or action may not become effective for at least 30 days from the date of publication of the EPA's notice of filing of the final environmental impact statement.
(2)If a supplement to a final environmental impact statement is prepared, it shall be incorporated into the rulemaking record. If the supplement is prepared following the close of the rulemaking record and is based on, or introduces, new data or major new alternatives or analyses, the rulemaking record will be reopened for at least 30 days to receive public comments. The final action may not become effective for at least 30 days following EPA publication of the filing of the supplemental statement.
(h)In accordance with 40 CFR 1505.2, when an agency prepares a final environmental impact statement, the agency shall prepare a concise public record of decision detailing what the decision was, what alternatives were considered (specifying the environmentally preferable alternative), how those considerations entered into the decision, and whether all practicable means to avoid or minimize environmental harm from the alternative selected have been adopted, and if not, the reason they were not. This record may be contained in, or integrated with, the preamble to the Federal Register notice of final action or in any other public document considered appropriate by the agency.
Connections39 cite this
Cited by 39 sections · top 33
register
- NoticesPreliminary Finding of No Significant Impact (FONSI) for a small Wind Turbine Installation to be located at the Pine Ridge Job Corps Center, 15710 Highway 385, Chadron, NE 69337
- NoticesFinal finding of no significant impact, Homestead Job Corps Center Proposed Disposal and Reuse, with a mailing address of 12350 SW 285th Street, Homestead, FL 33033 with the closest physical address at 470 Bougainville Boulevard, Homestead, FL
- NoticesEmployment and Training Administration, Department of Labor
- NoticesFinal finding of no significant impact Detroit Job Corps Center Phase II located at 11801 Woodrow Wilson Street, Detroit, Michigan
- NoticesPreliminary Finding of No Significant Impact (FONSI) for the proposed Job Corps Center to be located at the Gillis W
- Notices60-day notice of information collection under review—extension of currently approved collection
- NoticesFinal finding of no significant impact Shreveport Job Corps Center redevelopment located at 2815 Lillian Street, Shreveport, Louisiana
- NoticesFinal Finding of No Significant Impact (FONSI) for the New Job Corps Center to be located on Schoolland Woods Road (the former Ladd Center) in Exeter, Rhode Island
- NoticesFinal Finding of No Significant Impact Treasure Lake Job Corps Center Facility Improvements located at Indiahoma Road, Indiahoma, Oklahoma
- NoticesNotice
- NoticesFinal Finding of No Significant Impact Cassadaga Job Corps Center New Cafeteria located at 8115 Glasgow Rd, Cassadaga, New York
- NoticesNotice SUMMARY: Pursuant to the Council on Environmental Quality Regulations (40 CFR part 1500-08) implementing procedural provisions of the National Environmental Policy Act (NEPA), the Department of Labor, ETA, in accordance with 29 CFR 11
- NoticesNotice
- NoticesNotice of final finding of no significant impact
- NoticesFinal Finding of No Significant Impact (FONSI) for the proposed Job Corps Center to be located on Scott Hamilton Drive in Little Rock, Arkansas
- NoticesFinal Finding of No Significant Impact Tongue Point Job Corps Center Medical/Dental Building located at 37573 Old Highway 30 in Astoria, Oregon
- NoticesFinal Finding of No Significant Impact (FONSI) for the New Job Corps Center to be located off of Overlook Terrace within the Charter Oak Business Park in Hartford, Connecticut
- NoticesFinal finding of No Significant Impact (FONSI) for the new Job Corps Center to be located at 9 Vandever Avenue, Wilmington, Delaware
- NoticesFinal finding of no significant impact, grafton job corps center proposed new parking lot construction, located at 100 Pine Street, North Grafton, Massachusetts
- NoticesDEPARTMENT OF LABOR
- NoticesNotice of availability for comment of an environmental assessment SUMMARY: Building 1 (Administration/Education Building) and Building 2 (Gymnasium)and Building 5 (Cafeteria) at the Gulfport JCC, originally built as the 33rd Avenue High School, were completed in 1954 and are considered eligible for the National Register of Historic Places (NRHP)
- NoticesPreliminary Finding of No Significant Impact (FONSI) for the proposed Job Corps Center to be located on Scott Hamilton Drive in Little Rock, Arkansas
- NoticesPreliminary finding of no significant impact (FONSI) for the proposed acquisition of the property located at 515 South First Street and 118 East Lincoln Street, Phoenix, Arizona
- NoticesNotice
- NoticesFinal rule
- NoticesFinal Finding of No Significant Impact (FONSI) for the proposed Job Corps Center to be located at the former Gillis W
- NoticesSolicitation of comments for Updating the Strategic Plan
- NoticesFinal Finding of No Significant Impact (FONSI) for Small Wind Turbine Installation at the Pine Ridge Job Corps Center located at 15710 Highway 385, Chadron, NE 69337
- NoticesPreliminary finding of no significant impact (FONSI) for the proposed acquisition of the property located at 22 East Lincoln Street, Phoenix, Arizona
- NoticesPreliminary Finding of No Significant Impact (FONSI) for the proposed relocation of the Cleveland Job Corps Center to be located at 498 East 140th Street in Cleveland, Ohio
- NoticesNotice
- NoticesNotice on the Availability of the Year 2007 Form M-1 with Electronic Filing Option
- NoticesInstitution of a five-year review concerning the antidumping duty order on silicon metal from Russia
8 references not yet in our index
- 40 CFR 1501.7
- 40 CFR 1508.14
- 20 CFR 684.24
- 40 CFR 1500.3
- 40 CFR 1501.4(e)(2)
- 40 CFR 1506.9
- 40 CFR 1506.10
- 40 CFR 1505.2
Citation graph
cites case law
§ 11.11
Development of environmental analyses and documents.
Fed. Reg.×39
Cite40 CFR 1501.7
Cite40 CFR 1508.14
Cite20 CFR 684.24
Cite40 CFR 1500.3
Cite40 CFR 1501.4(e)(2)
Cites 8 · showing 5Cited by 39 across 1 source