Sec. 5141. DALLAS FLOODWAY, DALLAS, TEXAS
289 words·~1 min read·
/statute-compilations/comps-9003/sec-5141A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 5141 DALLAS FLOODWAY, DALLAS, TEXAS ###
(a)In General The project for flood control, Trinity River and tributaries, Texas, authorized by section 2 of the Act entitled, “An Act authorizing the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved March 2, 1945 (59 Stat. 18), is modified to— ####
(1)direct the Secretary to review the Balanced Vision Plan for the Trinity River Corridor, Dallas, Texas, dated December 2003 and amended in March 2004, prepared by the non-Federal interest for the project; ####
(2)direct the Secretary to review the Interior Levee Drainage Study Phase-I report, Dallas, Texas, dated September 2006, and the Interior Levee Drainage Study Phase–II report, Dallas, Texas, dated January 2009, prepared by the non-Federal interest; and ####
(3)if the Secretary determines that the project is technically sound and environmentally acceptable, authorize the Secretary to construct the project at a total cost of $459,000,000, with an estimated Federal cost of $298,000,000 and an estimated non-Federal cost of $161,000,000. ###
(b)Credit ####
(1)In-kind contributions The Secretary shall credit, in accordance with section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b), toward the non-Federal share of the cost of the project the cost of planning, design, and construction work carried out by the non-Federal interest for the project before the date of the partnership agreement for the project. ####
(2)Cash contributions The Secretary shall accept funds provided by the non-Federal interest for use in carrying out planning, engineering, and design for the project. The Federal share of such planning, engineering, and design carried out with non-Federal contributions shall be credited against the non-Federal share of the cost of the project.
Connections2 off-index
2 references not yet in our index
- 59 Stat. 18
- 42 USC 1962d–5b
Citation graph
cites case law
Sec. 5141
DALLAS FLOODWAY, DALLAS, TEXAS
Stat.59 Stat. 18
Cite42 USC 1962d–5b