Sec. 4072. TOLEDO HARBOR, MAUMEE RIVER, AND LAKE CHANNEL PROJECT, TOLEDO, OHIO
120 words·~1 min read·
/statute-compilations/comps-9003/sec-4072A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
## SEC. 4072 TOLEDO HARBOR, MAUMEE RIVER, AND LAKE CHANNEL PROJECT, TOLEDO, OHIO ###
(a)In General The Secretary shall conduct a study to determine the feasibility of constructing a project for navigation, Toledo, Ohio. ###
(b)Factors for Consideration In conducting the study under subsection (a), the Secretary shall take into consideration— ####
(1)realigning the existing Toledo Harbor channel widening occurring where the River Channel meets the Lake Channel from the northwest to the southeast side of the River Channel; ####
(2)realigning the entire 200-foot wide channel located at the upper river terminus of the River Channel southern river embankment towards the northern river embankment; and ####
(3)adjusting the existing turning basin to accommodate those changes.