## SEC. 3104 PEARL RIVER BASIN, MISSISSIPPI ###
(a)In General The project for flood damage reduction, Pearl River Basin, including Shoccoe, Mississippi, authorized by section 401(e)(3) of the Water Resources Development Act of 1986 (100 Stat. 4132), is modified to authorize the Secretary, subject to subsection (c), to construct the project generally in accordance with the plan described in the “Pearl River Watershed, Mississippi, Feasibility Study Main Report, Preliminary Draft”, dated February 2007, at a total cost of $205,800,000, with an estimated Federal cost of $133,770,000 and an estimated non-Federal cost of $72,030,000. ###
(b)Comparison of Alternatives Before initiating construction of the project, the Secretary shall compare the level of flood damage reduction provided by the plan that maximizes national economic development benefits of the project and the locally preferred plan, referred to as the LeFleur Lakes plan, to that portion of Jackson, Mississippi and vicinity, located below the Ross Barnett Reservoir Dam. ###
(c)Implementation of Plan ####
(1)In general If the Secretary determines under subsection
(b)that the locally preferred plan provides a level of flood damage reduction that is equal to or greater than the level of flood damage reduction provided by the national economic development plan and that the locally preferred plan is environmentally acceptable and technically feasible, the Secretary may construct the project identified as the national economic development plan, or the locally preferred plan, or some combination thereof. ####
(2)Construction by non-federal interests The non-Federal interest may carry out the project under section 211 of the Water Resources Development Act of 1996 (33 U.S.C. 701b–13). ###
(d)Project Financing In evaluating and implementing the project under this section, the Secretary shall allow the non-Federal interests to participate in the financing of the project in accordance with section 903(c) of the Water Resources Development Act of 1986 (100 Stat. 4184) if the detailed project report evaluation indicates that applying such section is necessary to implement the project. ###
(e)Non-Federal Cost Share If the locally preferred plan is selected for construction of the project, the Federal share of the cost of the project shall be limited to the share as provided by law for the elements of the national economic development plan.
Connections3 off-index
3 references not yet in our index
- 100 Stat. 4132
- 33 USC 701b–13
- 100 Stat. 4184
Citation graph
cites case law
Sec. 3104
PEARL RIVER BASIN, MISSISSIPPI
Stat.100 Stat. 4132
Cite33 USC 701b–13
Stat.100 Stat. 4184
Cites 3Cited by 0 across 0 sources