Sec. 2409. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS

280 words·~1 min read·/statute-compilations/comps-18280/sec-2409

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

## SEC. 2409 EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS ###
(a)Extension Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2022 (division B of Public Law 117–81; 135 Stat. 2161), the authorizations set forth in the table in subsection (b), as provided in sections 2401 and 2402 of that Act (135 Stat. 2173, 2174), shall remain in effect until October 1, 2025, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2026, whichever is later. ###
(b)Table The table referred to in subsection
(a)is as follows: **Defense Agencies and ERCIP Projects: Extension of 2022 Project Authorizations** **State/Country** **Installation or Location** **Project** **Original Authorized Amount** AlabamaFort Novosel10 MW RICE Generator Plant and Microgrid Controls$24,000,000CaliforniaMarine Corps Air Station MiramarAdditional LFG Power Meter Station$4,054,000 Naval Air Weapons Station China Lake-RidgecrestSolar Energy Storage System$9,120,000GeorgiaFort Moore4.8 MW Generation and Microgrid$17,593,000 Fort Stewart10 MW Generation Plant, with Microgrid Control$22,000,000GuamPolaris Point Submarine BaseInner Apra Harbor Resiliency Upgrades Ph 1.$38,300,000MichiganCamp Grayling650 KW Gas-Fired Micro-Turbine Generation System$5,700,000MississippiCamp Shelby10 MW Generation Plant an Feeder level Microgrid System$34,500,000 Camp ShelbyElectrical Distribution Infrastructure Undergrounding Hardening Project$11,155,000New YorkFort DrumWellfield Field Expansion Project$27,000,000North CarolinaFort Liberty10 MW Microgrid Utilizing Existing and New Generators$19,464,000 Fort LibertyEmergency Water System$7,705,000OhioSpringfield-Beckley Municipal AirportBase-Wide Microgrid With Natural Gas Generator, Photovoltaic and Battery Storage$4,700,000Puerto RicoAguadillaMicrogrid Control System, 460 KW PV, 275 KW Generator, 660 Kwh Bess$10,120,000 Fort AllenMicrogrid Control System, 690 KW PV, 275 KW Gen, 570 Kwh Bess$12,190,000TennesseeMemphis International AirportPV Arrays and Battery Storage$4,780,000United KingdomRoyal Air Force LakenheathHospital Replacement-Temporary Facilities$19,283,000VirginiaNational Geospatial-Intelligence Agency Campus EastElectrical System Redundancy$5,299,000 # TITLE XXV INTERNATIONAL PROGRAMS ## Subtitle A North Atlantic Treaty Organization Security Investment Program
Connectionstraces to 1
2 references not yet in our index
  • 135 Stat. 2161
  • 135 Stat. 2173
Citation graph
cites case law
Sec. 2409
EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS
Stat.135 Stat. 2161
Stat.135 Stat. 2173
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.