Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2013-08171 · Docket No. USCG-2013-0202 · 33 CFR 117
Summary
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Hawthorne Bridge across the Willamette River, mile 13.1, at Portland, OR. This deviation is necessary to accommodate Portland's Rock-n-Roll Half Marathon. This deviation allows the bridge to remain in the closed position to allow for the safe movement of event participants.
Dates
This deviation is effective on May 19, 2013, from 3 a.m. until 12:01 p.m.
Supplementary Information
Multnomah County has requested that the Hawthorne lift bridge remain closed to vessel traffic to facilitate safe, uninterrupted roadway passage of participants of the Rock-n-Roll Half Marathon event. The Hawthorne Bridge crosses the Willamette River at mile 13.1 and provides 49 feet of vertical clearance above Columbia River Datum 0.0 while in the closed position. Vessels which do not require a bridge opening may continue to transit beneath the bridge during this closure period. Under normal conditions this bridge operates in accordance with 33 CFR 117.897 which allows for the bridge to remain closed between 7 a.m. and 9 a.m. and 4 p.m. and 6 p.m. Monday through Friday. This deviation period is from 3 a.m. on May 19, 2013, until 12:01 p.m. May 19, 2013. The deviation allows the Hawthorne Bridge across the Willamette River, mile 13.1, to remain in the closed position and not open for maritime traffic from 3 a.m. on May 19, 2013, until 12:01 p.m. May 19, 2013. The bridge shall operate in accordance to 33 CFR 117.897 at all other times. Waterway usage on this stretch of the Willamette River includes vessels ranging from commercial tug and barge to small pleasure craft. Mariners will be notified and kept informed of the bridge's operational status via the Coast Guard Notice to Mariners publication and Broadcast Notice to Mariners as appropriate. The draw span will be required to open, if needed, for vessels engaged in emergency response operations during this closure period. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: March 25, 2013. Randall D. Overton, Bridge Administrator, Thirteenth Coast Guard District. [FR Doc. 2013-08171 Filed 4-8-13; 8:45 am]