Rules and Regulations. Notice of deviation from drawbridge regulation
/register/2013/04/09/2013-08169·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulation
Citation: FR Doc. 2013-08169 · Docket No. USCG-2013-0201 · 33 CFR 117
Summary
The Coast Guard has issued a temporary deviation from the operating schedule that governs the SR 529 Bridges across the Snohomish River, mile 3.6 near Everett, WA and the SR 529 Bridges across Steamboat Slough, mile 1.1, near Marysville, WA. This deviation is necessary to accommodate the Total Health Events Heroes Half Marathon. This deviation allows the bridges to remain in the closed position to allow safe movement of event participants.
Dates
This deviation is effective on April 28, 2013, from 7:00 a.m. until 12:01 p.m.
Supplementary Information
The Washington State Department of Transportation (WSDOT) has requested that the SR 529 Bridges across the Snohomish River and Steamboat Slough remain closed to vessel traffic to facilitate safe, uninterrupted roadway passage of participants of the Total Health Events Heroes Half Marathon. The SR 529 Bridges which cross the Snohomish River at mile 3.6 provide 38 feet of vertical clearance above mean high water elevation while in the closed position. The SR 529 Bridges which cross Steamboat Slough at mile 1.1 provide 10 feet of vertical clearance above mean high water elevation while in the closed position. Vessels which do not require a bridge opening may continue to transit beneath the bridges during this closure period. Under normal conditions the SR 529 Bridges crossing the Snohomish River operate in accordance with 33 CFR 117.1059(c) which requires advance notification of one-hour when a bridge opening is needed. Under normal conditions the SR 529 Bridges crossing Steamboat Slough operate in accordance with 33 CFR 117.1059(g) which requires advance notification of four hours when a bridge opening is needed. This deviation period is from 7:00 a.m. on April 28, 2013, to 12:01 p.m. April 28, 2013. The deviation allows the SR 529 Bridges crossing the Snohomish River and Steamboat Slough, to remain in the closed position and need not open for maritime traffic from 7:00 a.m. to 12:01 p.m. on April 28, 2013. The bridges shall operate in accordance to 33 CFR 117.1059 at all other times. Waterway usage on the Snohomish River and Steamboat Slough includes vessels ranging from commercial tug and barge to small pleasure craft. Mariners will be notified and kept informed of the bridges' operational status via the Coast Guard Notice to Mariners publication and Broadcast Notice to Mariners as appropriate. The bridges will be required to open, if needed, for vessels engaged in emergency response operations during this closure period. In accordance with 33 CFR 117.35(e), the drawbridges must return to their regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: March 25, 2013. Randall D. Overton, Bridge Administrator, Thirteenth Coast Guard District. [FR Doc. 2013-08169 Filed 4-8-13; 8:45 am]
Connectionstraces to 2
- 33 CFR 117