Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2013-03-28 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

447 words·~2 min read·/register/2013/03/28/2013-07151·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2013-07151 · Docket No. USCG-2013-0176 · 33 CFR 117

Summary

The Coast Guard has issued a temporary deviation from the regulation governing the operation of the Route 107 temporary bridge across the Saugus River, mile 2.5, between Saugus and Lynn, Massachusetts. The bridge will not open for vessel traffic during the installation of the moveable span. This deviation allows the bridge to remain closed for six days.

Dates

This deviation is effective from April 1, 2013, until April 6, 2013.

Supplementary Information

The Route 107 temporary bridge, across the Saugus River, mile 2.5, between Saugus and Lynn, Massachusetts, has a vertical clearance in the closed position of 6 feet above mean high water and 15 feet above mean low water. The bridge is required to open on signal at all times in accordance with 33 CFR 117.5. The waterway is transited by recreational and commercial fishing boats. The lift span at the new bridge will be installed between April 1, 2013, and April 6, 2013. During that time period the span will be in the closed position. Once the construction of the lift span is completed the draw will be placed in the full open position until all the operating machinery is installed. The upstream facilities and the fishermen were advised regarding the six day closure. No objections were received. Under this temporary deviation the Route 107 temporary bridge may remain in the closed position from April 1, 2013 through April 6, 2013. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: March 18, 2013. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. 2013-07151 Filed 3-27-13; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.