Rules and Regulations. Notice of deviation from drawbridge regulations
/register/2013/03/28/2013-07148·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of deviation from drawbridge regulations
Citation: FR Doc. 2013-07148 · Docket No. USCG-2013-0167 · 33 CFR 117
Summary
The Coast Guard has issued a temporary deviation from the operating schedules that govern two of North Carolina Department of Transportation (NCDOT) bridges: The S.R. 74 Bridge, across the Atlantic Intracoastal Waterway (AIWW), mile 283.1, at Wrightsville Beach, NC, and the Isabel S. Holmes Bridge across the Northeast Cape Fear River, mile 1.0, at Wilmington, NC. This deviation is necessary to accommodate the 6th annual PPD Beach2Battleship iron and half iron distance triathlons. This deviation allows both drawbridges to remain in the closed position during the race.
Dates
This deviation is effective from 7 a.m. to 6 p.m. on October 26, 2013.
Supplementary Information
The Wilmington Family YMCA, on behalf of NCDOT who owns and operates both the Isabel S. Holmes and the S.R. 74 bridges, has requested a temporary deviation from the current operating regulations set out in 33 CFR 117.829 (a) and 33 CFR 117.821(a)(4), respectively. Due to changes in the event times, the following drawbridges will now be closed to navigation to accommodate the 6th annual PPD Beach2Battleship iron and half iron distance triathlons on Saturday, October 26, 2013: the Isabel S. Holmes Bridge from 10:30 a.m. to 6 p.m.; and the S.R.74 Bridge from 7 a.m. to 11:30 a.m. There are no alternate routes for vessels transiting these sections of the Northeast Cape Fear River and the AIWW. The drawbridges will be able to open in the event of an emergency. The majority of the vessels that transit through these bridges during this time of year are primarily recreational boats. The Coast Guard will inform all users of the waterways through our Local and Broadcast Notice to Mariners of the closure periods for the drawbridges so that vessels can arrange their transits to minimize any impacts caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: March 19, 2013. Waverly W. Gregory, Jr., Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2013-07148 Filed 3-27-13; 8:45 am]
Connectionstraces to 3
- 33 CFR 117