Rules and Regulations. Notice of temporary deviation from regulations
/register/2012/11/21/2012-28284·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2012-28284 · Docket No. USCG-2012-0995 · 33 CFR 117
Summary
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Clinton Railroad Drawbridge across the Upper Mississippi River, mile 518.0, at Clinton, Iowa. The deviation is necessary to allow time for performing needed maintenance and repairs to the bridge. This deviation allows the bridge to open on signal if at least 24 hours advance notice is given.
Dates
This deviation is effective from 12:01 a.m. December 15, 2012, until 9 a.m., March 15, 2013.
Supplementary Information
The Union Pacific Railroad Company requested a temporary deviation for the Clinton Railroad Drawbridge, mile 518.0, at Clinton, Iowa, across the Upper Mississippi to open on signal if at least 24 hours advance notice is given in order to facilitate needed bridge maintenance and repairs. The Clinton Railroad Drawbridge currently operates in accordance with 33 CFR 117.5, which states the general requirement that drawbridges shall open promptly and fully for the passage of vessels when a request to open is given in accordance with the subpart. In order to facilitate the needed bridge work, the drawbridge must be kept in the closed-to-navigation position. This deviation allows the bridge to open on signal if at least 24 hours advance notice is given from 12:01 a.m. December 15, 2012, until 9 a.m., March 15, 2013. There are no alternate routes for vessels transiting this section of the Upper Mississippi River. The Clinton Railroad Drawbridge, in the closed-to-navigation position, provides a vertical clearance of 18.7 feet above normal pool. Navigation on the waterway consists primarily of commercial tows and recreational watercraft. This temporary deviation has been coordinated with waterway users. No objections were received. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: November 8, 2012. Eric A. Washburn, Bridge Administrator, Western Rivers. [FR Doc. 2012-28284 Filed 11-20-12; 8:45 am]
Connectionstraces to 2
- 33 CFR 117