Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2012-11-21 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

542 words·~2 min read·/register/2012/11/21/2012-28282·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2012-28282 · Docket No. USCG-2012-1002 · 33 CFR 117

Summary

The Coast Guard has issued a temporary deviation from the operating schedule that governs the Illinois Central Railroad Drawbridge across the Upper Mississippi River, mile 579.9, at Dubuque, Iowa. The deviation is necessary to allow the bridge owner time to perform preventive maintenance that is essential to the continued safe operation of the drawbridge. Maintenance is scheduled in the winter when there is less impact on navigation, instead of scheduling work in the summer, when river traffic increases. This deviation allows the bridge to open on signal if at least 24 hours advance notice is given.

Dates

This deviation is effective from 7 a.m., December 16, 2012, to 7 a.m. March 4, 2013.

Supplementary Information

The Chicago, Central & Pacific Railroad requested a temporary deviation for the Illinois Central Railroad Drawbridge across the Upper Mississippi River, mile 579.9, at Dubuque, Iowa, to open on signal if at least 24 hours advance notice is given in order to facilitate needed bridge maintenance and repairs. The Rock Illinois Central Railroad Drawbridge currently operates in accordance with 33 CFR 117.5, which states the general requirement that drawbridges must open promptly and fully for the passage of vessels when a request to open is given in accordance with the subpart. In order to facilitate the needed bridge work, the drawbridge must be kept in the closed-to-navigation position. This deviation allows the bridge to open on signal if at least 24 hours advance notice is given from 7 a.m. December 16, 2012 until 7 a.m., March 4, 2013. There are no alternate routes for vessels transiting this section of the Upper Mississippi River. The Illinois Central Railroad Drawbridge, in the closed-to-navigation position, provides a vertical clearance of 19.9 feet above normal pool. Navigation on the waterway consists primarily of commercial tows and recreational watercraft. The drawbridge will open if at least 24-hours advance notice is given. This temporary deviation has been coordinated with waterway users. No objections were received. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: November 8, 2012. Eric A. Washburn, Bridge Administrator, Western Rivers. [FR Doc. 2012-28282 Filed 11-20-12; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.