Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · REGISTER · 2012-04-06 · Coast Guard, DHS · Rules and Regulations

Rules and Regulations. Notice of temporary deviation from regulations

508 words·~2 min read·/register/2012/04/06/2012-8294·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2012-8294 · Docket No. USCG-2012-0230 · 33 CFR 117

Summary

The Coast Guard has issued a temporary deviation from the operating regulation that governs the Isleton Drawbridge across Sacramento River, mile 18.7, at Isleton, CA. The deviation is necessary to allow California Department of Transportation to paint and perform routine maintenance on the drawbridge. This deviation allows single leaf operation of the double leaf bascule style drawbridge during the project.

Dates

This deviation is effective from 7 a.m., April 20, 2012, to 6 p.m. on June 18, 2012.

Supplementary Information

The California Department of Transportation has requested a temporary change to the operation of the Isleton Drawbridge, mile 18.7, over Sacramento River, at Isleton, CA. The drawbridge navigation span provides a vertical clearance of 15 feet above Mean High Water in the closed-to-navigation position. The draw opens on signal from May 1 through October 31 from 6 a.m. to 10 p.m. and from November 1 through April 30 from 9 a.m. to 5 p.m. At all other times the draw shall open on signal if at least four hours notice is given to the drawtender at the Rio Vista bridge across the Sacramento River, mile 12.8, as required by 33 CFR 117.189(a). Navigation on the waterway is commercial and recreational. Either leaf of the double bascule drawspan may be secured in the closed-to-navigation position from 7 a.m., April 20, 2012 to 6 p.m. on June 18, 2012, to allow Caltrans to conduct painting and maintenance on the bridge. The opposite leaf will continue to operate normally, providing unlimited vertical clearance and 83 feet horizontal clearance between leafs. A work platform will be installed below the secured leaf, reducing vertical clearance by 6 feet. This temporary deviation has been coordinated with waterway users. No objections to the proposed temporary deviation were raised. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: March 23, 2102. D.H. Sulouff, District Bridge Chief, Eleventh Coast Guard District. [FR Doc. 2012-8294 Filed 4-5-12; 8:45 am]

Connectionstraces to 2
1 reference not yet in our index
  • 33 CFR 117
Citation graph
cites case law
Rules and Regulations
Notice of temporary deviation from regulations
Cite33 CFR 117
Cites 3Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.