Rules and Regulations. Notice of temporary deviation from regulations
/register/2012/04/06/2012-8293·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Agency: Coast Guard, DHS
Action: Notice of temporary deviation from regulations
Citation: FR Doc. 2012-8293 · Docket Number USCG-2012-0165 · 33 CFR 117
Summary
The Commander, Eighth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the Quad Cities Live Uncommon Walk to cross the bridge. This deviation allows the bridge to be maintained in the closed-to-navigation position for two hours.
Dates
This deviation is effective from 8:30 p.m. to 10:30 p.m. on June 2, 2012.
Supplementary Information
The U.S. Army Rock Island Arsenal requested a temporary deviation for the Rock Island Railroad and Highway Drawbridge, across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois to remain in the closed-to-navigation position for a two-hour period from 8:30 p.m. to 10:30 p.m., June 2, 2012, while a walk is held between the cities of Davenport, IA and Rock Island, IL. The Rock Island Railroad and Highway Drawbridge currently operates in accordance with 33 CFR 117.5, which states the general requirement that drawbridges shall open promptly and fully for the passage of vessels when a request to open is given in accordance with the subpart. There are no alternate routes for vessels transiting this section of the Upper Mississippi River. The Rock Island Railroad and Highway Drawbridge, in the closed-to-navigation position, provides a vertical clearance of 23.8 feet above normal pool. Navigation on the waterway consists primarily of commercial tows and recreational watercraft. This temporary deviation has been coordinated with waterway users. No objections were received. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: March 12, 2012. Eric A. Washburn, Bridge Administrator, Western Rivers. [FR Doc. 2012-8293 Filed 4-5-12; 8:45 am]
Connectionstraces to 2
- 33 CFR 117