Public Law 118-162. To clarify jurisdiction with respect to certain Bureau of Dec
776 words·~4 min read·
/plaw/118/public/162A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
An Act To clarify jurisdiction with respect to certain Bureau of Dec. 23, 2024[[H.R. 1607](/us/bill/118/hr/1607)]Reclamation pumped storage development, and for other purposes. * Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,* ## SECTION 1 LAND WITHDRAWAL AND RESERVATION Arizona. ###
(a)Definitions In this section: ####
(1)Agreement The term “**Agreement**” means the agreement between the United States and the Association dated September 6, 1917, as amended. ####
(2)Association The term “**Association**” means the Salt River Valley Water Users’ Association. ####
(3)Covered land The term “**covered land**” means the portion of the National Forest System land located on the south side of the Salt River from the March 9, 1903, 1-mile withdrawal area for the Bureau of Reclamation purposes extending an additional 2 miles from the Salt River at Roosevelt Dam to 18.25 river miles downstream, in the State of Arizona, not including the Superstition Mountain Wilderness Area and the Tonto National Monument, as depicted on the Map. ####
(4)District The term “**District**” means the Salt River Project Agricultural Improvement and Power District. ####
(5)Map The term “**Map**” means the map prepared under subsection (e)(1). ####
(6)SRP The term “**SRP**” means— #####
(A)the District; and #####
(B)the Association. ###
(b)Reservation of Covered Land Subject to valid existing rights, the covered land is reserved to the United States, through the Secretary of the Interior, for the exclusive right to use the covered land and interests in the covered land for the development, generation, and transmission of electrical power and energy for the use and benefit of the Salt River Federal Reclamation Project pursuant to the Agreement. ###
(c)Withdrawal of Covered Land The covered land is permanently withdrawn from— ####
(1)all forms of entry, appropriation, and disposal under the public land laws; ####
(2)location, entry, and patent under the mining laws; and ####
(3)operation of the mineral leasing, mineral materials, and geothermal leasing laws.138 STAT. 2576 ###
(d)Approvals.Facilities With respect to facilities constructed by SRP on the covered land for the development, generation, and transmission of electrical power and energy— ####
(1)Review.the design and specifications shall conform to Bureau of Reclamation standards, and final designs shall be subject to review and approval by the Secretary of the Interior; ####
(2)Inspection.all construction work shall be subject to inspection and approval by the Secretary of the Interior; ####
(3)Determination.upon a determination of substantial completion of such facilities, the Secretary of the Interior shall accept title on behalf of the United States as part of the Salt River Federal Reclamation Project pursuant to— #####
(A)section 6 of the Act of June 17, 1902 ([32 Stat. 389, chapter 1093](/us/stat/32/389/ch1093); [43 U.S.C. 498](/us/usc/t43/s498)); and #####
(B)the Agreement; and ####
(4)SRP shall be responsible for the care, operation, and maintenance pursuant to the Agreement. ###
(e)Map ####
(1)In general As soon as practicable after the date of enactment of this Act, the Secretary of Agriculture shall prepare a map depicting the boundary of the covered land. ####
(2)Availability The Map shall be on file and available for public inspection in the appropriate offices of the Forest Service and the Bureau of Reclamation. ###
(f)Management of Covered Land Management of the covered lands shall be in accordance with the Management Memorandum among the District, United States Department of Agriculture, Forest Service, and the Bureau of Reclamation, dated April 27, 1979, as amended. ###
(g)Relation to Other Law ####
(1)Compliance with environmental laws The Secretary of the Interior is directed to carry out all necessary environmental compliance under the National Environmental Policy Act of 1969 ([42 U.S.C. 4321](/us/usc/t42/s4321), et seq.), the Endangered Species Act of 1973 ([16 U.S.C. 1531](/us/usc/t16/s1531), et seq.), and all other applicable environmental laws and regulations, prior to construction of facilities on the covered land for the development, generation, and transmission of electrical power and energy. ####
(2)Lead agency The Bureau of Reclamation shall be the lead agency with respect to environmental compliance. ####
(3)Withdrawal not major federal action The withdrawal of the covered land shall not constitute a major Federal action under the National Environmental Policy Act of 1969 ([42 U.S.C. 4321](/us/usc/t42/s4321), et seq.). ####
(4)Antideficiency The United States shall not be liable for failure to carry out any obligation or activity authorized to be carried out under this title (including any such obligation or activity under the Agreement) if adequate appropriations 138 STAT. 2577 are not provided by Congress expressly to carry out the purposes of this Act. Approved December 23, 2024.
Connections22 cite this · traces to 4
Cited by 22 sections · top 13
statutes-at-large
register
Traces to 4 documents
Citation graph
cites case law
Public Law 118-162
To clarify jurisdiction with respect to certain Bureau of Dec
Stat.×14
Bills×6
Pub. L.×1
Fed. Reg.×1
Cites 4Cited by 22 across 4 sources