151.250 Plans for dams, levees, embankments, dikes, bridges, fill, or other
343 words·~2 min read·
/ky/151-250A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
obstruction to be approved and permit issued by cabinet -- Jurisdiction of
Department for Natural Resources.
(1)Notwithstanding any other provision of law, no person and no city, county, or other
political subdivision of the state, including levee districts, drainage districts, flood
control districts or systems, or similar bodies, shall commence the construction,
reconstruction, relocation, or improvement of any dam, embankment, levee, dike,
bridge, fill, or other obstruction, except those constructed by the Kentucky
Transportation Cabinet, in the floodplain or floodway of any stream, unless the
plans and specifications for such work have been:
(a)Submitted by the person or political subdivision responsible for the
construction, reconstruction, or improvement; and
(b)Approved in writing by the cabinet and a permit issued.
However, the cabinet by administrative regulation may exempt those dams,
embankments, or other obstructions which are not of such size or type as to require
approval by the cabinet in the interest of safety or retention of water supply.
(2)No person, city, county, or other political subdivision of the state shall commence
the filling of, or place a building, barrier, or obstruction of any sort in, any area in
the floodplain or floodway unless plans and specifications for such work have been
submitted to and approved by the cabinet and a permit issued as required in
subsection
(1)above.
(3)Nothing in this section is intended to give the cabinet any jurisdiction or control
over the construction, reconstruction, improvement, enlargement, maintenance, or
operation of any drainage district, ditch, or system established for agricultural
purposes. However, the cabinet may require approval prior to construction of
structures, dams, embankments, levees, bridges, fill, or other construction related to
agricultural operations that impact the base flood of a stream.
(4)The Department for Natural Resources through KRS Chapter 350 shall have
exclusive jurisdiction over KRS Chapter 151 concerning the regulation of dams,
levees, embankments, dikes, bridges, fills, or other obstructions across or along any
stream or in the floodway of any stream which structures are permitted under KRS
Chapter 350 for surface coal mining operations.