§ 7261
53 words·~1 min read·
/ca/labor-code/7261A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
When gathering and stacking temporary floor plank on a lower floor, in preparation for transferring such plank for use on an upper working floor, the steel erector’s personnel shall remove such plank successively, working toward the last panel of such floor, so that the work is always being done from the planked floor.