§ 7260
28 words·~1 min read·
/ca/labor-code/7260A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Prior to removal of temporary floor plank, employees shall be instructed by assigned supervision the steps to be taken to perform the work safely and in proper sequence.