Sec. 1015. Assessments required prior to start of construction on first ship of a shipbuilding program
246 words·~1 min read·
/bill/118/hr/8070/rds/section-1015·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Section 8669c of title 10, United States Code, is amended— in subsection (a)— in paragraph (2), by striking and at the end; in paragraph (3), by striking the period at the end and inserting ; and ; and by adding at the end the following new paragraph: certifies to the congressional defense committees that for each block of the ship’s construction, the detail design will be completed. ; in subsection (b), by adding at the end the following new paragraphs: For first ships and subsequent ships, the plan of the Navy to oversee and document the completion of the detail design for each block of the ship’s construction before construction of such block begins.
The extent to which information provided by a vendor to support the overall maturity and stability of a ship’s design is complete before construction on the ship begins, including with respect to information that confirms— vendor selection is complete for major distributive systems and key equipment supporting operational requirements of the ship; specifications are finalized for such major distributive systems and key equipment; and the status of factory acceptance testing, as applicable, to validate finalized specifications for such major distributive systems and key equipment through manufacturing. ; and in subsection (c)(1)— in the matter preceding subparagraph (A), by striking computer aided models and inserting the completion of 3D computer aided modeling ; and in subparagraph (C)— by inserting positions and before routes ; and by inserting all major before distributive systems .