Sec. 12028. Effluent limitations for wastewater, spills, and runoff from facilities associated with the transport and packaging of pre-production plastic materials
251 words·~1 min read·
/bill/117/hr/3684/pcs/section-12028·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Not later than 180 days after the date of enactment of this Act, the Administrator of the Environmental Protection Agency shall issue such regulations as are necessary to ensure that— the discharge of plastic pellets or other pre-production plastic materials (including discharge into wastewater and other runoff) from facilities regulated under part 414 or 463 of title 40, Code of Federal Regulations (as in effect on the date of enactment of this Act), is prohibited; the discharge of plastic pellets or other pre-production plastic materials (including discharge into wastewater and other runoff) from a point source associated with the making, use, packaging, or transportation of such plastic pellets and other pre-production plastic materials is prohibited; and the requirements under paragraphs
(1)and
(2)are reflected in— permits issued under section 402 of the Federal Water Pollution Control Act ( 33 U.S.C. 1342 ) to facilities or other point sources that make, use, package, or transport plastic pellets or other pre-production plastic materials, as determined by the Administrator, in addition to other applicable limits and standards; and all standards of performance promulgated under section 312(p) of the Federal Water Pollution Control Act ( 33 U.S.C. 1322(p) ) that are applicable to point sources associated with the making, use, packaging, or transportation of plastic pellets or other pre-production plastic materials, as determined by the Administrator. In this section, the term point source has the meaning given such term in section 502 of the Federal Water Pollution Control Act ( 33 U.S.C. 1362 ).
Connectionstraces to 3
Citation graph
cites case law
Sec. 12028
Effluent limitations for wastewater, spills, and runoff from facilities associated with the transport and packaging of pre-production plastic materials
Cites 3Cited by 0 across 0 sources