Sec. 203. Expedited modifications of existing feasibility studies
454 words·~2 min read·
/bill/116/s/1811/eah/section-203A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The Secretary shall expedite the completion of the following feasibility studies, as modified by this section, and if the Secretary determines that a project that is the subject of the feasibility study is justified in a completed report, may proceed directly to preconstruction planning, engineering, and design of the project: The study for flood risk reduction authorized by section 142 of the Water Resources Development Act of 1976 (90 Stat. 2930), is modified to authorize the Secretary to— investigate the ocean shoreline of San Mateo, San Francisco, and Marin Counties for the purposes of providing flood protection against tidal and fluvial flooding; with respect to the bay and ocean shorelines of San Mateo, San Francisco, and Marin Counties, investigate measures to adapt to rising sea levels; and with respect to the bay and ocean shorelines, and streams running to the bay and ocean shorelines, of San Mateo, San Francisco, and Marin Counties, investigate the effects of proposed flood protection and other measures or improvements on— the local economy; habitat restoration, enhancement, or expansion efforts or opportunities; public infrastructure protection and improvement; stormwater runoff capacity and control measures, including those that may mitigate flooding; erosion of beaches and coasts; and any other measures or improvements relevant to adapting to rising sea levels.
The study for flood control and allied purposes for the Sacramento River Basin, authorized by section 209 of the Flood Control Act of 1962 (76 Stat. 1197), is modified to authorize the Secretary to conduct a study for flood risk management, southern Sutter County between the Sacramento River and Sutter Bypass, California. In carrying out the program to implement projects to restore the Salton Sea, California, authorized by section 3032 of the Water Resources Development Act of 2007 (121 Stat. 1113; 130 Stat. 1677), the Secretary is authorized to carry out a study for the construction of a perimeter lake, or a northern or southern subset thereof, for the Salton Sea, California.
The study for flood and storm damage reduction for the New York and New Jersey Harbor and Tributaries project, authorized by the Act of June 15, 1955 (chapter 140, 69 Stat. 132), and being carried out pursuant to the Disaster Relief Appropriations Act, 2013 ( Public Law 113–2 ), is modified to require the Secretary to— evaluate and address the impacts of low-frequency precipitation and sea-level rise on the study area; consult with affected communities; and ensure the study is carried out in accordance with section 1001 of the Water Resources Reform and Development Act of 2014 ( 33 U.S.C. 2282c ).
Where appropriate, the Secretary may use the authority provided by section 216 of the Flood Control Act of 1970 ( 33 U.S.C. 549a ) to carry out this section.
Connectionstraces to 3
Traces to 3 documents
5 references not yet in our index
- 90 Stat. 2930
- 76 Stat. 1197
- 121 Stat. 1113
- 130 Stat. 1677
- 69 Stat. 132
Citation graph
cites case law
Sec. 203
Expedited modifications of existing feasibility studies
Stat.90 Stat. 2930
Stat.76 Stat. 1197
Stat.121 Stat. 1113
Stat.130 Stat. 1677
Stat.69 Stat. 132
Cites 8Cited by 0 across 0 sources