79.04 Public utility distribution.
134 words·~1 min read·
/wi/chapter-79/79-04A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
79.04 Public utility distribution.
(1)Annually, except for production plants that begin operation after December 31, 2003, or begin operation as a repowered production plant after December 31, 2003, and except as provided in sub.
(4m), the department of administration, upon certification by the department of revenue, shall distribute to a municipality having within its boundaries a production plant, general structure, or substation, used by a light, heat, or power company assessed under s. 76.28
(2)or 76.29
(2), except property described in s. 66.0813 unless the production plant or substation is owned or operated by a local governmental unit located outside of the municipality, or by an electric cooperative assessed under ss. 76.07 and 76.48 , respectively, or by a municipal electric company under s. 66.0825 the amount determined as follows: