Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Wisconsin · Chapter 30 — Navigable waters, harbors and navigation

30.132 Riparian rights.

491 words·~2 min read·/wi/chapter-30/30-132

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

30.132 Riparian rights.
(1)Definitions. In this section:
(a)“Commission” means the public service commission.
(b)“Hydroelectric operator” means an operator of a project.
(c)“Project” means a hydroelectric project regulated by the federal energy regulatory commission or the department.
(d)“Project riparian” means an owner of land that abuts a navigable waterway, the abutting bed of which is owned by a hydroelectric operator.
(2)Presumption of riparian rights. An owner of land that abuts a navigable waterway is presumed to be a riparian owner and is entitled to exercise all rights afforded to a riparian owner, including the right to place a pier, other structures, or deposits, even if the bed of the waterway is owned in whole or in part by another, unless those rights are specifically prohibited by the deed to the land, written agreement, or other recorded instrument. The exercise of these riparian rights is subject to the requirements of this chapter and, if the waterway is within the boundaries of a project, the reasonable restrictions imposed by the hydroelectric operator necessary for the hydroelectric operator to comply with requirements imposed under state or federal law or a federal energy regulatory commission license.
(3)Project riparian rights.
(a)Application to exercise riparian rights. A project riparian may make written application to the applicable hydroelectric operator for permission to exercise a riparian right in a waterway within the boundaries of a project, including the right to place a pier or other structures or deposits and the right to modify an existing structure authorized under par.
(b), subject to the requirements of this chapter. The hydroelectric operator shall approve or deny an application under this paragraph no later than 60 days after receiving the application. The hydroelectric operator may deny an application under this paragraph only if necessary for the hydroelectric operator to comply with requirements imposed under state or federal law or a federal energy regulatory commission license but may approve the application subject to reasonable restrictions necessary for the hydroelectric operator to comply with requirements imposed under state or federal law or a federal energy regulatory commission license. The hydroelectric operator may charge an applicant a reasonable fee to cover the hydroelectric operator’s administrative costs related to a structure or deposit that is approved under this paragraph.
(b)Existing structures. Notwithstanding par.
(a), a project riparian may maintain a structure that was placed in a waterway within the boundaries of a project prior to June 20, 2021, subject to the requirements of this chapter and the reasonable restrictions imposed by the hydroelectric operator necessary for the hydroelectric operator to comply with requirements imposed under state or federal law or a federal energy regulatory commission license. A hydroelectric operator may not charge a fee related to a structure authorized under this paragraph unless a fee is provided for in an agreement between the hydroelectric operator and the project riparian that existed prior to June 20, 2021.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.