182.70 Wisconsin Valley Improvement Company.
969 words·~4 min read·
/wi/chapter-182/182-70-2A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
182.70 Wisconsin Valley Improvement Company.
(1)Definitions. In this section:
(a)“Capital invested” means capital actually paid in and the par value of all negotiable bonds or other obligations issued by the company.
(b)“Commission” means the public service commission.
(c)“Company” means the Wisconsin Valley Improvement Company, its successors and assigns.
(d)“Department” means the department of natural resources.
(2)Purpose of the company.
(a)The company shall produce as nearly a uniform flow of water as practicable in the Wisconsin and Tomahawk rivers by storing in reservoirs surplus water for discharge when the water supply is low to improve the usefulness of the rivers for all public purposes and to reduce flood damage.
(b)If maintaining uniform flow in the Wisconsin River below and above the north line of Lincoln County at the same time is impracticable, the company shall give preference to maintaining uniform flow in portions of the river above this line.
(3)Rights, powers and authority. Subject to chs. 30 and 31 :
1. The company may create, acquire or lease an entire reservoir project or otherwise maintain, operate or control a system of water reservoirs located in or along the Wisconsin river. These reservoirs shall be located north of township 37 north in or along the Wisconsin River, and in or along any tributary of the Wisconsin River that discharges into the river at any point north of the south line of township 23 north. The company may create, acquire, maintain and operate waterways to divert flood waters from or to the Wisconsin River to or from reservoirs on other rivers.
Diversion of flood waters shall be subject to approval by the department. The company may construct, acquire and maintain dams, booms and other structures in, along or across this portion of the Wisconsin River and its tributaries to accomplish the purposes of this section. The company may clean out, straighten, deepen or otherwise improve any tributary to improve navigation of the tributary or of the Wisconsin River, or to prevent injury to property bordering on the rivers.
2. The company may not exercise the authority granted in subd. 1. on that part of the Eagle river and lakes lying between the point where the Eagle River enters Cranberry Lake, in section 31, township 40 north, range 11 east, and the Wisconsin River.
1. All franchises, other than corporate franchises, and all riparian rights and rights of flowage acquired by purchase or grant by any person or by any corporation organized to improve the navigation of the Wisconsin or Tomahawk river, or any of their tributaries may be assigned to the company.
2. Subdivision 1. shall not amend or repeal chapter 532, laws of 1887 , chapter 252, laws of 1889 , chapter 483, laws of 1905 , chapter 26, laws of 1903 , or any amendment to those chapters. The company may not exercise eminent domain over any property used under those chapters, nor any other property devoted to public uses except as authorized in pars.
(c)and
(f).
(c)The dam authorized by chapter 532, laws of 1887 , may be raised, or a new dam or dams may be constructed and maintained, in the Eagle River between Long and Cranberry lakes in townships 39 and 40 north, range 11 east, to raise the water in Long Lake 6 inches higher than the high water mark established by the dam authorized by chapter 532, laws of 1887 . Between May 1 and the succeeding November 1 the waters shall not be drawn down in Long Lake more than 18 inches below the high water mark. The company shall maintain the navigability of Eagle River between Long and Cranberry lakes for boats up to 50 feet in length with 12-foot beam and drawing 5 feet of water. If the construction, maintenance or operation of the new dam or dams requires the removal of the dam maintained under chapter 532, laws of 1887 , or impairs the use of the dam or its appurtenances as a bridge across the Eagle River, the company shall either:
1. Provide a suitable bridge for H 15 loading, as provided in the standard specifications for highway bridges, adopted by the American association of state highway and transportation officials (1977), with suitable approaches, for safe and convenient passage over the new dam, or if more than one dam is built, over the dam nearest to the dam maintained under chapter 532, laws of 1887 ; or
2. At its election provide a suitable new bridge and approaches across the river at a point that will conveniently connect with the highway crossing the river.
(d)The company may collect uniform tolls for the passage of boats over the dam the company builds under par.
(c), proportioned to the size of the boat. The total fees collected may not exceed the cost of the care, maintenance and operation of the means of passage.
(e)The company may acquire by condemnation any property, interest in property or other right necessary to create, maintain or operate any reservoir, dam or other improvement, if the property cannot be purchased at an agreed price.
(f)The commission shall appraise the damage caused by a taking or overflow of state lands occurring under this section. The company shall pay the amount appraised to the state treasury.
(4)Private remedies. Any owner whose premises or access to the premises are injured by being divided, surrounded by water, flooded or waterlogged, or whose natural drainage is destroyed or injured by any dam or other construction built or operated by the company, may sue for damages or an injunction in the circuit court for the county where some part of the damaged lands are located. The injured party may choose a trial by jury.