Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Washington · Title 86 — Flood Control · Chapter 86.26

RCW 86.26.040

137 words·~1 min read·/wa/title-86/chapter-86-26/86-26-040·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Whenever state grants under this chapter are used in a flood control maintenance project, the engineer of the county within which the project is located shall approve all plans for the specific project and shall supervise the work. The approval of such plans, construction and expenditures by the department of ecology, in consultation with the department of fish and wildlife, shall be a condition precedent to state participation in the cost of any project beyond planning and designing the specific project.
Additionally, state grants may be made to counties for preparation of a comprehensive flood control management plan required to be prepared under RCW 86.26.050 .
[ 1994 c 264 s 77 ; 1988 c 36 s 63 ; 1986 c 46 s 2 ; 1984 c 212 s 3 ; 1951 c 240 s 6 .]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.