Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Washington · Title 82 — Excise Taxes · Chapter 82.12

RCW 82.12.810

379 words·~2 min read·/wa/title-82/chapter-82-12/82-12-810·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(1)For the purposes of this section, "air pollution control facilities" mean any treatment works, control devices and disposal systems, machinery, equipment, structures, property, property improvements, and accessories, that are installed or acquired for the primary purpose of reducing, controlling, or disposing of industrial waste that, if released to the outdoor atmosphere, could cause air pollution, or that are required to meet regulatory requirements applicable to their construction, installation, or operation.
(2)The provisions of this chapter do not apply in respect to:
(a)The use of air pollution control facilities installed and used by a light and power business, as defined in RCW 82.16.010 , in generating electric power; or
(b)The use of labor and services performed in respect to the installing of air pollution control facilities.
(3)The exemption provided under this section applies only to air pollution control facilities that are:
(a)Constructed or installed after May 15, 1997, and used in a thermal electric generation facility placed in operation after December 31, 1969, and before July 1, 1975; and
(b)Constructed or installed to meet applicable regulatory requirements established under state or federal law, including the Washington clean air act, chapter 70A.15 RCW.
(4)This section does not apply to the use of tangible personal property for maintenance or repairs of the pollution control equipment or to labor and services performed in respect to such maintenance or repairs.
(5)If production of electricity at a thermal electric generation facility for any calendar year after 2002 and before 2023 falls below a twenty percent annual capacity factor for the generation facility, all or a portion of the tax previously exempted under this section in respect to construction or installation of air pollution control facilities at the generation facility shall be due according to the schedule provided in RCW 82.08.810 (5).
(6)*RCW 82.32.393 applies to this section.
[ 2020 c 20 s 1479 ; 2003 c 5 s 12 ; 1997 c 368 s 3 .]
Notes:
*Reviser's note: RCW 82.32.393 expired December 31, 2015.
Finding — Intent — Retroactive application — Effective date — 2003 c 5: See notes following RCW 82.12.010 .
Findings — Intent — Rules adoption — Severability — Effective date — 1997 c 368: See notes following RCW 82.08.810 .
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.