(1)The capital plan must adhere to the following:
(a)A current ridership demand forecast;
(b)Vehicle level of service standards as described in RCW 47.06.140 ;
(c)Operational strategies as described in RCW 47.60.327 ; and
(d)Terminal and vessel design standards as described in RCW 47.60.365 .
(2)The capital plan must include the following:
(a)A current vessel preservation plan;
(b)A current systemwide vessel rebuild and replacement plan as described in RCW 47.60.377 ;
(c)A current vessel deployment plan; and
(d)A current terminal preservation plan that adheres to the life-cycle cost model on capital assets as described in RCW 47.60.345 .
[ 2010 c 283 s 5 ; 2008 c 124 s 3 ; 2007 c 512 s 13 .]
Notes:
Findings — Intent — Effective date — 2010 c 283: See notes following RCW 47.60.355 .
Finding — Intent — 2007 c 512: See note following RCW 47.06.140 .