RCW 36.57A.070
138 words·~1 min read·
/wa/title-36/chapter-36-57a/36-57a-070·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The comprehensive transit plan adopted by the authority shall be reviewed by the state department of transportation to determine:
(1)The completeness of service to be offered and the economic viability of the transit system proposed in such comprehensive transit plan;
(2)Whether such plan integrates the proposed transportation system with existing transportation modes and systems that serve the benefit area;
(3)Whether such plan coordinates that area's system and service with nearby public transportation systems;
(4)Whether such plan is eligible for matching state or federal funds.
[ 2006 c 334 s 30 ; 1985 c 6 s 5 ; 1975 1st ex.s. c 270 s 17 .]
Notes:
Effective date — 2006 c 334: See note following RCW 47.01.051 .
Severability — Effective date — 1975 1st ex.s. c 270: See notes following RCW 35.58.272 .