Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Washington · Title 35 — Cities and Towns · Chapter 35.41

RCW 35.41.090

130 words·~1 min read·/wa/title-35/chapter-35-41/35-41-090·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

In setting the rates to be charged for the service, use, or benefits derived from such facility or utility, or in determining the cost of the planning, acquisition, construction, reconstruction, development, improvement, extension, repair, maintenance, or operation thereof the legislative body of the city or town may include all costs and estimated costs of the issuance of said bonds, all engineering, inspection, fiscal and legal expense and interest which it is estimated will accrue during the construction period and for such period of time thereafter deemed by the legislative body to be necessary or desirable on money borrowed, or which it is estimated will be borrowed in connection therewith.
[ 1971 ex.s. c 223 s 4 ; 1965 c 7 s 35.41.090 . Prior: 1957 c 117 s 9 .]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.