RCW 18.104.049
51 words·~1 min read·
/wa/title-18/chapter-18-104/18-104-049·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The department by rule shall adopt procedures to permit a well operator to modify construction standards to meet unforeseen circumstances encountered during the construction of a well. The procedures shall be developed in consultation with the technical advisory group established in RCW 18.104.190 .
[ 1993 c 387 s 7 .]