Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Virginia · Title 15.2 · Chapter 22

Code of Virginia § 15.2-2321. Adoption of road improvements program.

489 words·~2 min read·/va/title-15-2/chapter-22/15-2-2321·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Prior to adopting a system of impact fees, the locality shall conduct an assessment of road improvement needs benefiting an impact fee service area and shall adopt a road improvements plan for the area showing the new roads proposed to be constructed and the existing roads to be improved or expanded and the schedule for undertaking such construction, improvement or expansion. The road improvements plan shall be adopted as an amendment to the required comprehensive plan and shall be incorporated into the capital improvements program or, in the case of the counties where applicable, the six-year plan for secondary highway construction pursuant to § 33.2-331 .
The locality shall adopt the road improvements plan after holding a duly advertised public hearing in accordance with § 15.2-2204 .
The locality at a minimum shall include the following items in assessing road improvement needs and preparing a road improvements plan:
1. An analysis of the existing capacity, current usage and existing commitments to future usage of existing roads, as indicated by
(i)current and projected service levels,
(ii)current valid building permits outstanding, and
(iii)approved and pending site plans and subdivision plats. If the current usage and commitments exceed the existing capacity of the roads, the locality also shall determine the costs of improving the roads to meet the demand. The analysis shall include any off-site road improvements or cash payments for road improvements accepted by the locality and shall include a plan to fund the current usages and commitments that exceed the existing capacity of the roads.
2. The projected need for and costs of construction of new roads or improvement or expansion of existing roads attributable in whole or in part to projected new development. Road improvement needs shall be projected for the impact fee service area when fully developed in accord with the comprehensive plan and, if full development is projected to occur more than 20 years in the future, at the end of a 20-year period. The assumptions with regard to land uses, densities, intensities, and population upon which road improvement projections are based shall be presented.
3. The total number of new service units projected for the impact fee service area when fully developed and, if full development is projected to occur more than 20 years in the future, at the end of a 20-year period. A "service unit" is a standardized measure of traffic use or generation. The locality shall develop a table or method for attributing service units to various types of development and land use, including but not limited to residential, commercial and industrial uses.
The table shall be based upon the ITE manual (published by the Institute of Transportation Engineers) or locally conducted trip generation studies, and consistent with the traffic analysis standards adopted pursuant to § 15.2-2222.1 .
1989, c. 485, § 15.1-498.4; 1992, c. 465; 1997, c. 587 ; 2007, c. 896 ; 2024, cc. 225 , 242 .
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.