73-5a-402. Standard operating plans required.
97 words·~1 min read·
/ut/title-73/chapter-5a/73-5a-402A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Effective 5/7/2025
73-5a-402. Standard operating plans required.
The owner of each dam shall prepare a standard operating plan for the dam. In the case of a dam in operation prior to May 1, 1991, the standard operating plan shall be submitted to the state engineer for the state engineer's approval by May 1, 1994. In the case of any dam beginning operations on or after May 1, 1991, the standard operating plan shall be submitted to the state engineer for the state engineer's approval prior to the final inspection.
Amended by Chapter 302 , 2025 General Session