54-18-302. Public workshops.
After a public utility files the notice of intent in accordance with Subsection 54-18-301(3) and before it files a land use application, the public utility shall:
(1)conduct informal public workshops at locations along the proposed corridor to provide information about:
(a)the high voltage power line; and
(b)the process for obtaining a land use permit; and
(2)provide notice of the public workshops at least 14 days before a public workshop to:
(a)a newspaper of general circulation in the target study area;
(b)radio stations in the target study area; and
(c)an affected entity.
Enacted by Chapter 316 , 2009 General Session