Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · U.S. Code · Title 43 - PUBLIC LANDS · CHAPTER 12— RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT · SUBCHAPTER XI–B— AGING INFRASTRUCTURE · § 510a

§ 510a. Guidelines and inspection of project facilities and technical assistance to transferred works operating entities

509 words·~2 min read·/usc/title-43/section-510a

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)Guidelines and inspections
(1)Development of guidelines Not later than 1 year after March 30, 2009, the Secretary in consultation with transferred works operating entities shall develop, consistent with existing transfer contracts, specific inspection guidelines for project facilities which are in proximity to urbanized areas and which could pose a risk to public safety or property damage if such project facilities were to fail.
(2)Conduct of inspections Not later than 3 years after March 30, 2009, the Secretary shall conduct inspections of those project facilities, which are in proximity to urbanized areas and which could pose a risk to public safety or property damage if such facilities were to fail, using such specific inspection guidelines and criteria developed pursuant to paragraph (1). In selecting project facilities to inspect, the Secretary shall take into account the potential magnitude of public safety and economic damage posed by each project facility.
(3)Treatment of costs The costs incurred by the Secretary in conducting these inspections shall be nonreimbursable.
(b)Use of inspection data The Secretary shall use the data collected through the conduct of the inspections under subsection (a)(2) to—
(1)provide recommendations to the transferred works operating entities for improvement of operation and maintenance processes, operating procedures including operation guidelines consistent with existing transfer contracts, and structural modifications to those transferred works;
(2)determine an appropriate inspection frequency for such nondam project facilities which shall not exceed 6 years; and
(3)provide, upon request of transferred work operating entities, local governments, or State agencies, information regarding potential hazards posed by existing or proposed residential, commercial, industrial or public-use development adjacent to project facilities.
(c)Technical assistance to transferred works operating entities
(1)Authority of Secretary to provide technical assistance The Secretary is authorized, at the request of a transferred works operating entity in proximity to an urbanized area, to provide technical assistance to accomplish the following, if consistent with existing transfer contracts:
(A)Development of documented operating procedures for a project facility.
(B)Development of documented emergency notification and response procedures for a project facility.
(C)Development of facility inspection criteria for a project facility.
(D)Development of a training program on operation and maintenance requirements and practices for a project facility for a transferred works operating entity’s workforce.
(E)Development of a public outreach plan on the operation and risks associated with a project facility.
(F)Development of any other plans or documentation which, in the judgment of the Secretary, will contribute to public safety and the sage operation of a project facility.
(2)Costs The Secretary is authorized to provide, on a non-reimbursable basis, up to 50 percent of the cost of such technical assistance, with the balance of such costs being advanced by the transferred works operating entity or other non-Federal source. The non-Federal 50 percent minimum cost share for such technical assistance may be in the form of in-lieu contributions of resources by the transferred works operating entity or other non-Federal source.
(Pub. L. 111–11, title IX, § 9602, Mar. 30, 2009, 123 Stat. 1347.)
Connections2 cite this
2 references not yet in our index
  • Pub. L. 111–11, title IX, § 9602
  • 123 Stat. 1347
Citation graph
cites case law
§ 510a
Guidelines and inspection of project facilities and technical assistance to transferred works operating entities
Stat.×1
U.S.C.×1
Pub. L.Pub. L. 111–11, title IX, § 9602
Stat.123 Stat. 1347
Cites 2Cited by 2 across 2 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.