Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · U.S. Code · Title 42 - THE PUBLIC HEALTH AND WELFARE · CHAPTER 159— SPACE EXPLORATION, TECHNOLOGY, AND SCIENCE · SUBCHAPTER II— EXPANSION OF HUMAN SPACE FLIGHT BEYOND THE INTERNATIONAL SPACE STATION AND LOW-EARTH ORBIT · § 18324

§ 18324. Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle

289 words·~1 min read·/usc/title-42/section-18324

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)In general In developing the Space Launch System pursuant to section 18322 of this title and the multi-purpose crew vehicle pursuant to section 18323 of this title, the Administrator shall, to the extent practicable utilize—
(1)existing contracts, investments, workforce, industrial base, and capabilities from the Space Shuttle and Orion and Ares 1 projects, including—
(A)space-suit development activities for application to, and coordinated development of, a multi-purpose crew vehicle suit and associated life-support requirements with potential development of standard NASA-certified suit and life support systems for use in alternative commercially-developed crew transportation systems; and
(B)Space Shuttle-derived components and Ares 1 components that use existing United States propulsion systems, including liquid fuel engines, external tank or tank-related capability, and solid rocket motor engines; and
(2)associated testing facilities, either in being or under construction as of October 11, 2010.
(b)Discharge of requirements In meeting the requirements of subsection (a), the Administrator—
(1)shall, to the extent practicable, utilize ground-based manufacturing capability, ground testing activities, launch and operations infrastructure, and workforce expertise;
(2)shall, to the extent practicable, minimize the modification and development of ground infrastructure and maximize the utilization of existing software, vehicle, and mission operations processes;
(3)shall complete construction and activation of the A–3 test stand with a completion goal of September 30, 2013;
(4)may procure, develop, and flight test applicable components; and
(5)shall take appropriate actions to ensure timely and cost-effective development of the Space Launch System and the multi-purpose crew vehicle, including the use of a procurement approach that incorporates adequate and effective oversight, the facilitation of contractor efficiencies, and the stream-lining of contract and procurement requirements.
(Pub. L. 111–267, title III, § 304, Oct. 11, 2010, 124 Stat. 2816.)
Connections10 cite this · traces to 2
2 references not yet in our index
  • Pub. L. 111–267, title III, § 304
  • 124 Stat. 2816
Citation graph
cites case law
§ 18324
Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle
Bills×8
Stat. Comp.×1
Stat.×1
Pub. L.Pub. L. 111–267, title III, § 304
Stat.124 Stat. 2816
Cites 4Cited by 10 across 3 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.