§ 701b–4. Administration of surveys; number authorized; reports
527 words·~2 min read·
/usc/title-33/section-701b-4A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The surveys authorized to be performed under the direction of the Secretary of the Army as well as all duties performed by the Chief of Engineers under the direction of the Secretary of the Army shall be functions of the Engineer Corps, United States Army, and its head, to be administered under the direction of the Secretary of the Army and the supervision of the Chief of Engineers except as otherwise specifically provided by Congress: Provided , That the power and authority conferred by the Flood Control Act of June 28, 1938 , and previously conferred, upon the Federal Power Commission shall remain in full force and effect:
Provided , That no preliminary examination, survey, project, or estimate for new works other than those designated in this Act or some prior Act or joint resolution shall be made: Provided further , That after the regular or formal reports made as required by law on any examination, survey, project, or work under way or proposed, are submitted, no supplemental or additional report or estimate shall be made unless authorized by law. ( Aug. 11, 1939, ch. 699, § 6 , 53 Stat. 1415 ;
July 26, 1947, ch. 343 , title II, § 205(a), 61 Stat. 501 .)
Connections5 off-index
5 references not yet in our index
- 53 Stat. 1415
- 61 Stat. 501
- 52 Stat. 1215
- 53 Stat. 1414
- 64 Stat. 1265
Citation graph
cites case law
§ 701b–4
Administration of surveys; number authorized; reports
Stat.53 Stat. 1415
Stat.61 Stat. 501
Stat.52 Stat. 1215
Stat.53 Stat. 1414
Stat.64 Stat. 1265
Cites 5Cited by 0 across 0 sources