§ 76m. Photovoltaic system
214 words·~1 min read·
/usc/title-20/section-76mA research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)In general The Board may study, plan, design, engineer, and construct a photovoltaic system for the main roof of the John F. Kennedy Center for the Performing Arts.
(b)Report Not later than 60 days before beginning construction of the photovoltaic system pursuant to subsection (a), the Board shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the feasibility and design of the project.
(Pub. L. 85–874, § 7, as added, Pub. L. 110–338, § 3, Oct. 3, 2008, 122 Stat. 3731.)
Connections4 cite this
Cited by 4 sections
statutes-at-large
statute-compilations
14 references not yet in our index
- Pub. L. 85–874, § 7
- Pub. L. 110–338, § 3
- 122 Stat. 3731
- 72 Stat. 1700
- Pub. L. 86–297
- 73 Stat. 573
- Pub. L. 88–100, § 4
- 77 Stat. 128
- Pub. L. 88–260, § 1(2)
- 78 Stat. 4
- Pub. L. 99–514, § 2
- 100 Stat. 2095
- Pub. L. 101–449, § 3
- 104 Stat. 1050
Citation graph
cites case law
§ 76m
Photovoltaic system
U.S.C.×2
Stat. Comp.×1
Stat.×1
Pub. L.Pub. L. 85–874, § 7
Pub. L.Pub. L. 110–338, § 3
Stat.122 Stat. 3731
Stat.72 Stat. 1700
Pub. L.Pub. L. 86–297
Cites 14 · showing 5Cited by 4 across 3 sources