§ 63.1448. What are my general requirements for complying with this subpart?
166 words·~1 min read·
/us/cfr/t40/s§ 63.1448·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)Before November 12, 2024, you must be in compliance with the emission limitations, work practice standards, and operation and maintenance requirements in this subpart at all times, except during periods of startup, shutdown, and malfunction as defined in § 63.2. On or after November 12, 2024, you must be in compliance with the emission limitations, work practice standards, design standards, and operation and maintenance requirements in this subpart at all times.
(b)During the period between the compliance date specified for your affected source in § 63.1443, and the date upon which continuous monitoring systems have been installed and certified and any applicable operating limits have been set, you must maintain a log detailing the operation and maintenance of the process and emissions control equipment.
(c)Before November 12, 2024, you must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). For affected sources, a startup, shutdown, and malfunction plan is not required on or after November 12, 2024.
Connections1 cite this
Cited by 1 section
Citation graph
cites case law
§ 63.1448
What are my general requirements for complying with this subpart?
Fed. Reg.×1
Cites 0Cited by 1 across 1 source