§ 60.733. Reconstruction.
65 words·~1 min read·
/us/cfr/t40/s§ 60.733·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The cost of replacement of equipment subject to high temperatures and abrasion on processing equipment shall not be considered in calculating either the “fixed capital cost of the new components” or the “fixed capital cost that would be required to construct a comparable new facility” under § 60.15. Calciner and dryer equipment subject to high temperatures and abrasion are: end seals, flights, and refractory lining.