§ 60.4845. What emission limits and standards must I meet and by when?
111 words·~1 min read·
/us/cfr/t40/s§ 60.4845·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
You must meet the emission limits and standards specified in Table 1 or 2 to this subpart within 60 days after your SSI unit reaches the feed rate at which it will operate or within 180 days after its initial startup, whichever comes first. The emission limits and standards apply at all times the unit is operating, and during periods of malfunction. The emission limits and standards apply to emissions from a bypass stack or vent while sewage sludge is in the combustion chamber (i.e., until the sewage sludge feed to the combustor has been cut off for a period of time not less than the sewage sludge incineration residence time).
Connections1 cite this
Cited by 1 section
register
Citation graph
cites case law
§ 60.4845
What emission limits and standards must I meet and by when?
Fed. Reg.×1
Cites 0Cited by 1 across 1 source