§ 60.4790. How are these new source performance standards structured?
59 words·~1 min read·
/us/cfr/t40/s§ 60.4790·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
These new source performance standards contain the nine major components listed in paragraphs
(a)through
(i)of this section.
(a)Preconstruction siting analysis.
(b)Operator training and qualification.
(c)Emission limits, emission standards, and operating limits.
(d)Initial compliance requirements.
(e)Continuous compliance requirements.
(f)Performance testing, monitoring, and calibration requirements.
(g)Recordkeeping and reporting.
(h)Definitions.
(i)Tables.