Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 36 — Parks, Forests, and Public Property · Part 9 · § 9.84

§ 9.84. Existing conditions and proposed area of operations.

387 words·~2 min read·/us/cfr/t36/s§ 9.84·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)You must submit to-scale maps that clearly depict:
(1)The boundaries of your oil or gas rights in relation to your proposed operations and the relevant System unit boundary;
(2)The natural features, including, but not limited, to streams, lakes, ponds, wetlands, seepage areas, springs, shallow water aquifers, topographic relief, and areas we have indicated to you as environmentally sensitive;
(3)The locations of existing roads, trails, railroad tracks, pads, and other disturbed areas; and
(4)The locations of existing structures that your operations could affect, including but not limited to: Buildings, pipelines, existing or permitted oil or gas wells, freshwater wells, underground and overhead electrical lines, and other utility lines.
(b)You must submit the following information about geologic conditions in their natural state and under the proposed operating conditions:
(1)Estimated depths and names of known zones of usable water, brine, hydrocarbon, geothermal, or other mineral-bearing zones based on the best available information;
(2)Potential hazards to persons and the environment such as known abnormal pressure zones, lost circulation zones, hydrogen sulfide gas, or karst formations; and
(3)Nature, extent, and depth (if known) of near-surface bedrock fracturing or jointing relative to proposed cemented surface casing-seat depth and any open annular interval proposed in the well design.
(c)You must submit the following information for any new surface disturbances or construction:
(1)Maps depicting the proposed area of operations, boundaries of new surface disturbances and proposed access routes;
(2)Maps depicting the proposed location of all support facilities, including those for transportation (e.g., vehicle parking areas, airstrips, helicopter pads), sanitation, occupation, staging areas, fuel dumps, refueling areas, loading docks, water supplies, and disposal facilities;
(3)The methods and diagrams, including cross-sections, of any proposed pad construction, road construction, cut-and-fill areas, and surface maintenance, including erosion control;
(4)The number and types of equipment and vehicles, including an estimate of vehicular trips, associated with each phase of your operation;
(5)An estimated time to complete each phase of the proposed operations, including any operational timing constraints;
(6)The type and extent of security measures proposed within your area of operations;
(7)The power sources and their transmission systems for the proposed operations; and
(8)The types and quantities of all solid and liquid waste generation and the proposed methods of storage, handling, and off-site disposal.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.