§ 292.69. Concurrent reclamation.
35 words·~1 min read·
/us/cfr/t36/s§ 292.69·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Plans of operations involving locatable minerals, operating plans involving outstanding mineral rights, and contracts or permits for mineral materials should all provide, to the maximum extent practicable, that reclamation proceed concurrently with the mineral operation.