§ 75.605. After the construction.
75 words·~1 min read·
/us/cfr/t34/s§ 75.605·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)A grantee must ensure that sufficient funds will be available for effective operation and maintenance of the facilities after the construction is complete.
(b)A grantee must operate and maintain the facilities in accordance with applicable Federal, State, and local requirements.
(c)A grantee must maintain all financial records, supporting documents, statistical records, and other non-Federal entity records pertinent to the construction project consistent with 2 CFR 200.334. \[89 FR 70332, Aug. 29, 2024\]
Connectionstraces to 1
Traces to 1 document
Citation graph
cites case law
§ 75.605
After the construction.
Cites 1Cited by 0 across 0 sources