Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · CFR · Title 33 — Navigation and Navigable Waters · Part 154 · § 154.2204

§ 154.2204. Fire, explosion, and detonation protection.

388 words·~2 min read·/us/cfr/t33/s§ 154.2204·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

This section applies to tank barge cleaning facilities (TBCFs) collecting vapors of flammable, combustible, or non-high flash point liquid cargoes.
(a)A vapor control system
(VCS)with a single facility vapor connection that processes vapor with a vapor recovery unit must---
(1)Have a detonation arrester located as close as practicable to the facility vapor connection. The total pipe length between the detonation arrester and the facility vapor connection must not exceed 18 meters (59.1 feet) and the vapor piping between the detonation arrester and the facility vapor connection must be protected from any potential internal or external ignition source; or
(2)Have an inerting, enriching, or diluting system that meets the requirements of 33 CFR 154.2107.
(b)A VCS with a single facility vapor connection that processes vapor with a vapor destruction unit must---
(1)Have a detonation arrester located as close as practicable to the facility vapor connection. The total pipe length between the detonation arrester and the facility vapor connection must not exceed 18 meters (59.1 feet) and the vapor piping between the detonation arrester and the facility vapor connection must be protected from any potential internal or external ignition source; and
(2)Have an inerting, enriching, or diluting system that meets the requirements of 33 CFR 154.2107.
(c)A VCS with multiple facility vapor connections that processes vapor with a vapor recovery unit must have a detonation arrester located as close as practicable to each facility vapor connection. The total pipe length between the detonation arrester and each facility vapor connection must not exceed 18 meters (59.1 feet) and the vapor piping between the detonation arrester and the facility vapor connection must be protected from any potential internal or external ignition source.
(d)A VCS with multiple facility vapor connections that processes vapor with a vapor destruction unit must---
(1)Have a detonation arrester located as close as practicable to each facility vapor connection. The total pipe length between the detonation arrester and each facility vapor connection must not exceed 18 meters (59.1 feet) and the vapor piping between the detonation arrester and the facility vapor connection must be protected from any potential internal or external ignition source; and
(2)Have an inerting, enriching, or diluting system that meets the requirements of 33 CFR 154.2107.
(e)33 CFR 154.2105(j) applies to a TBCF's VCS.
Connectionstraces to 2
Citation graph
cites case law
§ 154.2204
Fire, explosion, and detonation protection.
Cites 2Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.