§ 117.965. Cow Bayou.
52 words·~1 min read·
/us/cfr/t33/s§ 117.965·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The draws of the Orange County highway bridge, mile 2.9 at West Orange, and the S87 bridge, mile 4.5 at Bridge City, shall open on signal if at least six hours notice is given. \[CGD 82-025, 49 FR 17452, Apr. 24, 1984, as amended by USCG-2012-0306, 77 FR 37315, June 21, 2012\]