§ 117.953. Brazos River (Diversion Channel).
46 words·~1 min read·
/us/cfr/t33/s§ 117.953·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)The draw of the S36 highway bridge, mile 4.4 at Freeport, shall open on signal if at least 12 hours notice is given.
(b)The draw of the Union Pacific railroad bridge, mile 22.6 at Brazoria, need not be opened for the passage of vessels.