§ 117.850. Black River.
96 words·~1 min read·
/us/cfr/t33/s§ 117.850·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(a)The Charles Berry Bridge, mile 0.6, will open on signal, except from January 1 through March 31 when the bridge will open if a 12-hour advance notice is given. The bridge will operate and maintain a VHF-FM Marine Radio and a telephone number.
(b)The Norfolk Southern Railroad Bridge, mile 1.2, will open on signal, except from January 1 through March 31 when the bridge will open if a 12-hour advance notice is given. The bridge will operate and maintain a VHF-FM Marine Radio and a telephone number. \[USCG-2023-0187, 89 FR 24383, Apr. 8, 2024\]
Connections1 cite this
Cited by 1 section
Citation graph
cites case law
§ 117.850
Black River.
Fed. Reg.×1
Cites 0Cited by 1 across 1 source