§ 117.755. Shrewsbury River.
153 words·~1 min read·
/us/cfr/t33/s§ 117.755·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The draw of the Sea Bright Bridge at mile 4.0, across the Shrewsbury River at Sea Bright, New Jersey, shall operate as follows:
(a)The draw shall open on signal at all times; except that, from the Friday before Memorial Day through Labor Day, on Friday, Saturday, Sunday and holidays, between 9 a.m. and 7.pm., the draw need only open on the hour.
(b)The draw need not be opened at any time for a sail boat unless it is operating under auxiliary power or is being towed by a powered vessel.
(c)The owners of the bridge shall keep in good legible condition two clearance gages with figures not less than eight inches high, designed, installed, and maintained according to the provisions of § 118.160 of this chapter. \[USCG-2010-0461, 75 FR 38714, July 6, 2010, as amended by USCG-2018-0874, 84 FR 30879, June 28, 2019; USCG-2017-0460, 84 FR 32622, July 9, 2019\]
Connections14 cite this
Cited by 14 sections · top 9
register
- Proposed RulesNotice of proposed rulemaking
- Rules and RegulationsFinal rule
- Proposed RulesNotice of proposed rulemaking
- Rules and RegulationsFinal rule
- Rules and RegulationsFinal rule
- Rules and RegulationsFinal rule
- Proposed RulesNotice of proposed rulemaking
- Proposed RulesNotice of proposed rulemaking
- Rules and RegulationsNotice of temporary deviation from regulations; request for comments
Citation graph
cites case law
§ 117.755
Shrewsbury River.
Fed. Reg.×14
Cites 0Cited by 14 across 1 source