§ 117.620. Westport River---East Branch.
109 words·~1 min read·
/us/cfr/t33/s§ 117.620·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The Westport Point Bridge, mile 1.2 at Westport, shall operate as follows:
(a)Public vessels of the United States must be passed as soon as possible.
(b)The owners of this bridge shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 12 inches high designed, installed, and maintained, according to the provisions of § 118.160 of this chapter.
(c)That the drawspan for the Westport Point Drawbridge, mile 1.2 at Westport, must open on signal if at least 24 hours notice is given. \[CGD1-91-014, 56 FR 41462, Aug. 21, 1991, as amended by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006\]